Construction and infrastructure leaders are facing new regulatory requirements, targeted regulator activity and recent incident warnings. Four developments warrant a practical review of fall protection, hazardous exposure controls, demolition planning and electrical isolation.
WA fall protection requirements now apply
Western Australia’s transitional arrangements for fall protection in high risk construction work have ended. From 1 October 2026, regulation 79 of the Work Health and Safety (General) Regulations 2022 applies to this work.
Where a fall risk cannot reasonably be eliminated, the regulation requires a PCBU to minimise the risk by providing adequate protection. The specified order is a fall prevention device where reasonably practicable, then a work positioning system and, if neither higher order option is reasonably practicable, a fall arrest system.
WorkSafe WA says inspectors will expect evidence of a genuine effort to manage fall risks and may take enforcement action where requirements have not been met. Leaders should review work at height procedures, SWMS, equipment selection and assurance records against the operative requirement.
Read WorkSafe WA’s statement of regulatory intent.
Victoria sets its construction priorities for 2026–27
WorkSafe Victoria’s new construction strategy identifies falls from height, asbestos and respirable crystalline silica as focus areas for 2026–27. It also identifies small and medium duty holders, businesses with limited recent regulator contact and men aged 20 to 34 as priority cohorts.
Planned action includes strategic visit programs for falls, asbestos and silica, supported by regulatory intervention and enforcement where non-compliance is found. The strategy is not a legislative amendment, but it provides a clear indication of where inspection attention will be directed.
Victorian construction businesses should test whether site controls are visible and verifiable, including how higher order controls are selected and exposure controls maintained.
View WorkSafe Victoria’s 2026–27 construction strategy.
NSW demolition collapse highlights risks beyond the boundary
SafeWork NSW reported that an unplanned partial collapse of a wall and roof during site preparation for demolition sent debris into an adjacent car park and injured two members of the public on 3 August 2026. The regulator has not published findings about cause or culpability.
Its incident guidance emphasises competent demolition planning, a site-specific demolition control plan, the sequence of work, identification of structural components and protection of adjoining roads, car parks and walkways.
Project leaders should treat public interface risks as part of the demolition method, not as a perimeter issue. Review engineering input, exclusion zones, temporary stability and the authority to stop work when conditions differ from the plan.
Read SafeWork NSW’s incident information.
NT alert reinforces electrical isolation before drilling
NT WorkSafe issued an arc flash safety alert on 23 October 2026 after two incidents involving drilling on or near energised electrical equipment. One involved a drill contacting a live switchboard busbar. The other caused an arc flash, small fire and burns to two workers while a cable remained connected to a battery.
The alert identifies ineffective de-energisation and isolation, work departing from the SWMS and inadequate risk assessment as possible contributing factors. It calls for risk assessment whenever the scope changes, effective lock out and tag out, review of controls near live conductors and appropriate protective equipment.
Leaders should verify that isolation is proven before work starts and that field changes trigger a fresh assessment rather than an informal workaround.
Read the NT WorkSafe safety alert.
What leaders should review now
These developments point to the same assurance test: can the organisation show that critical controls are operating at the point of work? Review fall protection decisions, exposure control verification, demolition sequencing, public exclusion arrangements and electrical isolation. Documentation matters, but evidence from the workface matters more.